/
Reservedele
/
Udenbords
/
Suzuki
/
4-stroke
/
DF100
/
Suzuki DF70A, DF80A, DF90A, DF100B (E01/E11) 2020-2023 [DF90A_E11_023]
Knastaksel (DF75A, DF80A)
| Pos.nr. | Beskrivelse | Type | Kvalitet | Lager | Pris | Ordre |
|---|---|---|---|---|---|---|
| 1 | CAMSHAFT COMP,INTK DF80A/K9 |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
2.993,03 kr.
|
|
| 2 | CAMSHAFT COMP,EXH DF70A |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
3.081,68 kr.
|
|
| 3 | SPROCKET,CAMSHAFT DF70A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
246,01 kr.
|
|
| 4 | SPROCKET,EXH CAMSHAFT DF70A |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
422,31 kr.
|
|
| 5 | BOLT CAMSHAFT DF200-250 |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
47,81 kr.
|
|
| 6 | BOLT |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
21,91 kr.
|
|
| 7 | PIN,5X10 |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
18,93 kr.
|
|
| 8 | TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
369,53 kr.
|
|
| 9 | SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
102,59 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.74) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.76) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.78) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.80) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
105,58 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.82) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.84) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.86) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.88) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.90) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
105,58 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 14, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.08) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.10) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
105,58 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.12) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.16) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.18) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.20) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.22) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.24) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET (T:2.26) |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
134,46 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 14, 2026
|
132,48 kr.
|
|
|
Alt
|
SHIM,TAPPET DF70/90A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
132,48 kr.
|
|
| 10 | VALVE,INTK DF70A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
277,89 kr.
|
|
| 11 | VALVE,EXH DF70A |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
393,43 kr.
|
|
| 12 | SPRING, VALVE DF40/50 |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
93,63 kr.
|
|
| 13 | RETAINER,VALVE SPRING |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
57,00 kr.
|
|
| 14 | COTTER,VALVE |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
19,00 kr.
|
|
| 15 | SEAT, VALVE SPRING |
Original del (OEM)
|
— |
Forventet levering: okt. 13, 2026
|
34,86 kr.
|
|
| 16 | Seal |
Original del (OEM)
|
— |
Forventet levering: okt. 15, 2026
|
52,00 kr.
|
|